フォロー
Lamine Mahdjoubi
Lamine Mahdjoubi
Professor of ICT in Built Environment, UWE, Bristol
確認したメール アドレス: uwe.ac.uk
タイトル
引用先
引用先
Trends of 4D CAD applications for construction planning
D Heesom, L Mahdjoubi
Construction management and economics 22 (2), 171-182, 2004
3132004
Offsite construction: Developing a BIM-Based optimizer for assembly
AQ Gbadamosi, AM Mahamadu, LO Oyedele, OO Akinade, P Manu, ...
Journal of cleaner production 215, 1180-1190, 2019
1332019
Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities
H Omar, L Mahdjoubi, G Kheder
Computers in Industry 98, 172-182, 2018
1122018
Heritage building information modelling
Y Arayici, J Counsell, L Mahdjoubi, G Nagy, SZ Ḥawwās, K Dweidar
Routledge, 2017
982017
Providing real-estate services through the integration of 3D laser scanning and building information modelling
L Mahdjoubi, C Moobela, R Laing
Computers in Industry 64 (9), 1272-1281, 2013
912013
A framework to assist in the analysis of risks and rewards of adopting BIM for SMEs in the UK
TT Lam, L Mahdjoubi, J Mason
Journal of Civil Engineering and Management 23 (6), 740-752, 2017
842017
Challenges to BIM-cloud integration: Implication of security issues on secure collaboration
AM Mahamadu, L Mahdjoubi, C Booth
2013 IEEE 5th International Conference on Cloud Computing Technology and …, 2013
802013
Critical BIM qualification criteria for construction pre-qualification and selection
AM Mahamadu, L Mahdjoubi, CA Booth
Architectural Engineering and Design Management 13 (5), 326-343, 2017
662017
Towards a framework for evaluation of computer visual simulations in environmental design
L Mahdjoubi, J Wiltshire
Design studies 22 (2), 193-209, 2001
642001
The impact of sensory learning modalities on children’s sensitivity to sensory cues in the perception of their school environment
L Mahdjoubi, R Akplotsyi
Journal of Environmental Psychology 32 (3), 208-215, 2012
592012
Automated construction of variable density navigable networks in a 3D indoor environment for emergency response
P Boguslawski, L Mahdjoubi, V Zverovich, F Fadli
Automation in Construction 72, 115-128, 2016
572016
Design for occupational safety and health: key attributes for organisational capability
P Manu, A Poghosyan, AM Mahamadu, L Mahdjoubi, A Gibb, M Behm, ...
Engineering, Construction and Architectural Management 26 (11), 2614-2636, 2019
532019
Understanding the challenges of immersive technology use in the architecture and construction industry: A systematic review
A Prabhakaran, AM Mahamadu, L Mahdjoubi
Automation in Construction 137, 104228, 2022
502022
A web-based design for occupational safety and health capability maturity indicator
A Poghosyan, P Manu, AM Mahamadu, O Akinade, L Mahdjoubi, A Gibb, ...
Safety science 122, 104516, 2020
502020
Design for safety implementation factors: a literature review
A Poghosyan, P Manu, L Mahdjoubi, AGF Gibb, M Behm, AM Mahamadu
Journal of Engineering, Design and Technology 16 (5), 783-797, 2018
482018
Building information modelling (BIM) capability and delivery success on construction projects
AM Mahamadu, L Mahdjoubi, C Booth, P Manu, E Manu
Construction Innovation 19 (2), 170-192, 2019
432019
Indoor navigation from point clouds: 3D modelling and obstacle detection
L Díaz-Vilariño, P Boguslawski, K Khoshelham, H Lorenzo, L Mahdjoubi
The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016
432016
Emergency response in complex buildings: automated selection of safest and balanced routes
V Zverovich, L Mahdjoubi, P Boguslawski, F Fadli, H Barki
Computer‐Aided Civil and Infrastructure Engineering 31 (8), 617-632, 2016
402016
BIM-GIS modelling in support of emergency response applications
P Boguslawski, L Mahdjoubi, V Zverovich, F Fadli, H Barki
Building information modelling (BIM) in design, construction and operations …, 2015
342015
The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects
AM Mahamadu, P Manu, L Mahdjoubi, C Booth, C Aigbavboa, FH Abanda
Engineering, Construction and Architectural Management 27 (1), 24-48, 2019
332019
現在システムで処理を実行できません。しばらくしてからもう一度お試しください。
論文 1–20