Follow
Scott Mason
Scott Mason
Verified email at amazon.com
Title
Cited by
Cited by
Year
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzère-Pérès, SJ Mason, O Rose
Journal of scheduling 14, 583-599, 2011
4382011
Integrating the warehousing and transportation functions of the supply chain
SJ Mason, PM Ribera, JA Farris, RG Kirk
Transportation Research Part E: Logistics and Transportation Review 39 (2 …, 2003
3532003
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
SJ Mason, JW Fowler, W Matthew Carlyle
Journal of Scheduling 5 (3), 247-262, 2002
2712002
Improving electronics manufacturing supply chain agility through outsourcing
SJ Mason, MH Cole, BT Ulrey, L Yan
International Journal of Physical Distribution & Logistics Management 32 (7 …, 2002
1932002
Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems
Y Unlu, SJ Mason
Computers & Industrial Engineering 58 (4), 785-800, 2010
1672010
Workload control in the semiconductor industry
JW Fowler, GL Hogg, SJ Mason
Production Planning & Control 13 (7), 568-578, 2002
1302002
Operational planning and control of semiconductor wafer production
JND Gupta, R Ruiz, JW Fowler, SJ Mason
Production Planning & Control 17 (7), 639-647, 2006
1052006
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
SJ Mason, S Jin, CM Wessels
International Journal of Production Research 42 (3), 613-628, 2004
872004
Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
J Potoradi, OS Boon, SJ Mason
Proceedings of the Winter Simulation Conference 2, 1857-1861, 2002
822002
Multi-objective analysis of an integrated supply chain scheduling problem
E Cakici, SJ Mason, ME Kurz
International Journal of Production Research 50 (10), 2624-2638, 2012
732012
Parallel machine scheduling subject to auxiliary resource constraints
E Cakici, SJ Mason
Production Planning and Control 18 (3), 217-225, 2007
692007
Heuristics for minimizing total weighted tardiness in complex job shops
SJ Mason*, JW Fowler, WM Carlyle, DC Montgomery
International Journal of Production Research 43 (10), 1943-1963, 2005
692005
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities
ME Pfund, H Balasubramanian, JW Fowler, SJ Mason, O Rose
Journal of Scheduling 11, 29-47, 2008
652008
Semiconductor manufacturing scheduling and dispatching: state of the art and survey of needs
ME Pfund, SJ Mason, JW Fowler
Handbook of production scheduling, 213-241, 2006
612006
Metaheuristic scheduling of 300-mm lots containing multiple orders
P Qu, SJ Mason
IEEE Transactions on Semiconductor Manufacturing 18 (4), 633-643, 2005
602005
Modeling and analysis of a generic cross-docking facility
GM Magableh, MD Rossetti, S Mason
Proceedings of the Winter Simulation Conference, 2005., 8 pp., 2005
582005
Multiple orders per job compatible batch scheduling
V Erramilli, SJ Mason
IEEE Transactions on Electronics Packaging Manufacturing 29 (4), 285-296, 2006
532006
Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
J Jia, SJ Mason
International Journal of Production Research 47 (10), 2565-2585, 2009
502009
Scheduling complex job shops using disjunctive graphs: a cycle elimination procedure
SJ Mason, K Oey
International journal of production research 41 (5), 981-994, 2003
482003
Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times
ME Kurz, SJ Mason
International Journal of Production Research 46 (1), 131-151, 2008
382008
The system can't perform the operation now. Try again later.
Articles 1–20