An efficient genetic algorithm for the traveling salesman problem with precedence constraints C Moon, J Kim, G Choi, Y Seo European Journal of Operational Research 140 (3), 606-617, 2002 | 354 | 2002 |
Evolutionary algorithm for advanced process planning and scheduling in a multi-plant C Moon, Y Seo Computers & Industrial Engineering 48 (2), 311-325, 2005 | 174 | 2005 |
Mobile robot path planning with surrounding point set and path improvement J Han, Y Seo Applied Soft Computing 57, 35-47, 2017 | 135 | 2017 |
A tabu search algorithm for simultaneous machine/AGV scheduling problem Y Zheng, Y Xiao, Y Seo International Journal of Production Research 52 (19), 5748-5763, 2014 | 119 | 2014 |
Modelling and implementation of internet-based virtual machine tools SH Suh, Y Seo, SM Lee, TH Choi, GS Jeong, DY Kim The International Journal of Advanced Manufacturing Technology 21, 516-522, 2003 | 98 | 2003 |
Block assembly planning in shipbuilding using case-based reasoning Y Seo, D Sheen, T Kim Expert Systems with Applications 32, 245–253, 2007 | 74 | 2007 |
An improved particle swarm optimization for the resource-constrained project scheduling problem Q Jia, Y Seo The International Journal of Advanced Manufacturing Technology 67, 2627-2638, 2013 | 73 | 2013 |
Adaptive genetic algorithm for advanced planning in manufacturing supply chain C Moon, Y Seo, Y Yun, M Gen Journal of Intelligent Manufacturing 17, 509-522, 2006 | 64 | 2006 |
Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm C Moon, M Lee, Y Seo, YH Lee Computers & industrial engineering 43 (3), 605-621, 2002 | 58 | 2002 |
Flexible guidepath design for automated guided vehicle systems Y Seo, PJ Egbelu THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 33 (4), 1135-1156, 1995 | 52 | 1995 |
Development of web-based CAM system Y Seo, DY Kim, SH Suh The International Journal of Advanced Manufacturing Technology 28, 101-108, 2006 | 44 | 2006 |
Integrated manufacturing planning for an AGV-based FMS Y Seo, PJ Egbelu International Journal of Production Economics 60, 473-478, 1999 | 44 | 1999 |
Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation Q Jia, Y Seo Computers & Operations Research 40 (8), 2037-2050, 2013 | 39 | 2013 |
Structure modeling of machine tools and internet-based implementation Y Seo, DP Hong, I Kim, T Kim, D Sheen, GB Lee Proceedings of the Winter Simulation Conference, 2005., 6 pp., 2005 | 35 | 2005 |
A two-step heuristic algorithm for layout design of unequal-sized facilities with input/output points Y Xiao, Y Seo, M Seo International Journal of Production Research 51 (14), 4200-4222, 2013 | 34 | 2013 |
Process plan selection based on product mix and production volume Y Seo, PJ Egbelu International Journal of Production Research 34 (9), 2639-2655, 1996 | 31 | 1996 |
An effective coding approach for multiobjective integrated resource selection and operation sequences problem H Zhang, M Gen, Y Seo Journal of Intelligent Manufacturing 17, 385-397, 2006 | 27 | 2006 |
Tabu search algorithm for flexible flow path design of unidirectional automated-guided vehicle systems Y Seo, C Lee, C Moon OR spectrum 29, 471-487, 2007 | 24 | 2007 |
Advanced planning for minimizing makespan with load balancing in multi-plant chain C Moon, Y Seo* International journal of production research 43 (20), 4381-4396, 2005 | 17 | 2005 |
Path planning for a mobile robot using ant colony optimization and the influence of critical obstacle J Han, H Park, Y Seo Proceedings of the 2016 International Conference on Industrial Engineering …, 2016 | 14 | 2016 |