Follow
Behzad Nikjo
Behzad Nikjo
Graduated from mazandaran University of Science and Technology with M.Sc. degree in Industrial
Verified email at ustmb.ac.ir
Title
Cited by
Cited by
Year
A Non-permutation Flow shop Manufacturing Cell Scheduling Problem with Part’s Sequence dependent Family setup times
B Nikjo, Y zarook
International Journal of Applied Metaheuristic Computing (IJAMC) 5 (4), 70-86, 2014
92014
Decision making in best player selection: An integrated approach with AHP and Extended TOPSIS methods based on WeFA Freamwork in MAGDM problems
B Nikjo, J Rezaeian, N Javadian
International Journal of Research in Industrial Engineering, 2015
82015
Meta heuristic for minimizing makespan in a flow-line manufacturing cell with sequence Dependent family setup times
B Nikjo, J Rezaeian
Journal of Optimization in Industrial Engineering (JOIE) 16 (3), 21-29, 2014
82014
New Application of WeFA Framework and Fuzzy Delphi in Concert Locating
BN Iman Radfar, Sarfaraz Hashemkhani Zolfani
American Journal of Scientific Research, 108-112, 2012
32012
The system can't perform the operation now. Try again later.
Articles 1–4